Learn, Practice, and Improve with SAP C_IBP_2305 Practice Test Questions
- 84 Questions
- Updated on: 3-Mar-2026
- SAP Certified Application Associate - SAP SuccessFactors for Employee Central Payroll 2H/2022
- Valid Worldwide
- 2840+ Prepared
- 4.9/5.0
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.
A. Capacity leveling will be possible for production and storage resources.
B. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
C. Excess stock can be generated and will need to be staged in an overflow warehouse.
D. Minimum capacity utilization will result in pull production occurring.
C. Excess stock can be generated and will need to be staged in an overflow warehouse.
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.
A. Copying multiple key figures can be processed sequentially.
B. If necessary source key figures values are disaggregated.
C. Copying multiple key figures on different planning levels is not possible.
D. If necessary target key figures values are disaggregated.
B. If necessary source key figures values are disaggregated.
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
A. Lot sizes are applicable for production and handling quantities.
B. Periodic lot size setting overrides the minimum lot size.
C. Lot sizes are time-independent master data settings.
D. Lot sizes are applicable for production and transportation quantities.
C. Lot sizes are time-independent master data settings.
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are 2 correct answers to this question.
A. Time series analysis
B. Simple statistical forecast
C. Scenario analysis for operational supply planning
D. Multi-Level Supply Planning Heuristics
D. Multi-Level Supply Planning Heuristics
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
A. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
B. The number of lag-based snapshots are limited to nine levels.
C. Lag-based snapshots are created in the Configuration app for a fixed time range.
D. Target key figures for these snapshots are exposed to the user in planning views.
C. Lag-based snapshots are created in the Configuration app for a fixed time range.
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
A. Demand Driven Replenishment
B. Response Planning
C. Sales and Operations Planning
D. Inventory Optimization
E. Demand Sensing
D. Inventory Optimization
E. Demand Sensing
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note: There are 2 correct answers to this question.
A. Changing the member names
B. Changing the layout of the master data workbooks
C. Changing the entries from the Name Manager
D. SAP IBP ribbon extension
D. SAP IBP ribbon extension