Learn, Practice, and Improve with SAP C_IBP_2311 Practice Test Questions

  • 79 Questions
  • Updated on: 3-Mar-2026
  • SAP Certified Application Associate - SAP IBP for Supply Chain (2311)
  • Valid Worldwide
  • 2790+ Prepared
  • 4.9/5.0

Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question

A. Adjusted transportation receipts

B. Aggregated constraints

C. Maximum lot size

D. Transportation lead time

E. Minimum lot size

A.   Adjusted transportation receipts
D.   Transportation lead time
E.   Minimum lot size

Which of the following are features of lag-based snapshots? Note: There are 2 correct answers to this question

A. The number of lag-based snapshots are limited to nine levels.

B. Lag-based snapshots are created in the Configuration app for a fixed time range.

C. Target key figure for these snapshots are expressed to the user in planning view

D. Target key figure for these snapshots must have lag as root attribute in the base planning level

C.   Target key figure for these snapshots are expressed to the user in planning view
D.   Target key figure for these snapshots must have lag as root attribute in the base planning level

You are setting up planning with lot sizes. What are some of the properties of lot sizes that you need to beware of? Note: There are 2 correct answers to this question

A. Lot sizes are applicable for production and handling quantities.

B. Periodic lot size setting overrides the minimum lot size.

C. Lot size are time-independent master data settings

D. Lot size are applicable for production and transportation quantities

C.   Lot size are time-independent master data settings
D.   Lot size are applicable for production and transportation quantities

Which unified planning processes' data is commonly reviewed in SAP IBP for sales and operations? Mote: There are 2 correct answers to this question.

A. Global Demand Plan

B. Constrained Demand plan

C. Inventory Plan

D. Consensus Demand Plan

C.   Inventory Plan
D.   Consensus Demand Plan

You need to make manual adjustments to your S&OP plan. Which are possible ways of making these changes? Note: There are 2 correct answers to this question

A. Leveraging the web-based Planning capability

B. Leveraging the functionality of SAP Work zone

C. Using Microsoft Excel planning views

D. Using Driver-Based planning

A.   Leveraging the web-based Planning capability
C.   Using Microsoft Excel planning views

Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation? Note: There are 2 correct answers to this question.

A. The key figure is calculated and system editable

B. The key figure is calculated and all editable.

C. The key figure is stored and system editable.

D. The key figure is stored and all editable

C.   The key figure is stored and system editable.
D.   The key figure is stored and all editable

What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned? Note: There are 2 correct answers to this question.

A. Created as type DECIMAL and assigned to an external master data type

B. Created as type INTEGER and assigned to an compound master data type

C. Created as type INTEGER and assigned to a simple master data type

D. Created as type DECIMAL and assigned to an compound master data type

C.   Created as type INTEGER and assigned to a simple master data type
D.   Created as type DECIMAL and assigned to an compound master data type

Page 3 out of 12 Pages