You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?

A. Manual Planning Without Check

B. Consumption-Based Planning

C. Material Requirements Planning

D. Advanced Planning

B.   Consumption-Based Planning

During production order creation, several valid production versions are found. How does the system choose the production version?

A. Lot size or material cost

B. Validity period or sales order

C. Planned order or material number

D. Alphanumeric or quota arrangement

B.   Validity period or sales order

Which of the following automation options can you use for production orders? Note: There are 2 Correct answers to this question?

A. you can use mass processing to set production orders to technically complete

B. you can use the production scheduling profile to automatically set orders toI technically complete

C. You can use trigger points to automatically create rework orders via confirmation.

D. You can use mass processing to read PP master data for production orders

A.   you can use mass processing to set production orders to technically complete
C.   You can use trigger points to automatically create rework orders via confirmation.

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA.

Note: there are 2 correct answers to this question.

A. Manual maintenance

B. 100% check

C. First in First out (FIFO).

D. Simultaneous

A.   Manual maintenance
B.   100% check

Which of the following questions do you have to answer before you start creating a bill of material (BOM)?

A. Is the material type allowed in the BOM?

B. Which base unit of measure does the material have?

C. What status does the BOM have?

D. In which storage location is the BOM required?

A.   Is the material type allowed in the BOM?

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

A. Resource matrix

B. Resource network

C. Resource hierarchy

D. Resource selection

B.   Resource network
D.   Resource selection

Which time elements can be reduced by a reduction strategy?

Note: There are 3 correct answers to this question.

A. Goods receipt processing time

B. Move time

C. Wait time

D. Float after production

E. Queue time

B.   Move time
C.   Wait time
E.   Queue time