You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?
A. Manual Planning Without Check
B. Consumption-Based Planning
C. Material Requirements Planning
D. Advanced Planning
B. Consumption-Based Planning
During production order creation, several valid production versions are found. How does
the system choose the production version?
A. Lot size or material cost
B. Validity period or sales order
C. Planned order or material number
D. Alphanumeric or quota arrangement
B. Validity period or sales order
Which of the following automation options can you use for production orders? Note: There
are 2 Correct answers to this question?
A. you can use mass processing to set production orders to technically complete
B. you can use the production scheduling profile to automatically set orders toI technically
complete
C. You can use trigger points to automatically create rework orders via confirmation.
D. You can use mass processing to read PP master data for production orders
A. you can use mass processing to set production orders to technically complete C. You can use trigger points to automatically create rework orders via confirmation.
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA.
Note: there are 2 correct answers to this question.
A. Manual maintenance
B. 100% check
C. First in First out (FIFO).
D. Simultaneous
A. Manual maintenance B. 100% check
Which of the following questions do you have to answer before you start creating a bill of
material (BOM)?
A. Is the material type allowed in the BOM?
B. Which base unit of measure does the material have?
C. What status does the BOM have?
D. In which storage location is the BOM required?
A. Is the material type allowed in the BOM?
Your project uses process orders for the production of liquid chemicals. What can you
define to ensure that production flow only happens in suitable and physically connected
tanks? Note: There are 2 correct answers to this question.
A. Resource matrix
B. Resource network
C. Resource hierarchy
D. Resource selection
B. Resource network D. Resource selection
Which time elements can be reduced by a reduction strategy?
Note: There are 3 correct answers to this question.
Why Prepare with This Practice Test Before Your Exam?
The actual SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing exam features MCQs to be completed within a set timeframe, requiring both knowledge and time management. This C_TS422_2022 practice test mirrors the real exam format, helping you build confidence and pacing skills. More importantly, it identifies your knowledge gaps across key syllabus areas. All free C_TS422_2022 exam questions include detailed explanations as well, so you learn why an answer is correct, not just memorize responses.