Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

A. Check the dump size of the database export on disk.

B. Check the Charts Control Center in the SUM Ul

C. Check logs for jobs starting with RSUPG_SGEN in the SAP system.

D. Check the log files written in the SUM directory subdirectory abap. subdirectory log

A.   Check the dump size of the database export on disk.
D.   Check the log files written in the SUM directory subdirectory abap. subdirectory log

You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

A. Using R3load and network socket connection

B. Using R3load and memory pipes

C. Using R3load and file transfer

D. Using work processes and network socket connection

B.   Using R3load and memory pipes

Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

A. Downtime Optimized DMO (DoDMO)

B. Near-Zero Downtime Maintenance (nZDM)

C. Near-Zero Downtime Technology (NZDT)

D. Downtime Optimized Data Conversion (DoC)

C.   Near-Zero Downtime Technology (NZDT)

You are performing an SAP S/4HANA conversion with DMO. You are using the downtimeoptimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

A. Software update

B. Conversion

C. Main import

D. Migration

B.   Conversion
D.   Migration

You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.

What does the "Calculated level" indicate for those software components?

A. The SAP Support Packages that will be bound to the upgrade

B. The SAP Support Packages contained in the upgrade media

C. The SAP Support Packages found in the download directory

D. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

C.   The SAP Support Packages found in the download directory

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

A. PARMVNT_UPG

B. TABIMJJPG

C. PARDIST_SHD

D. TABIM_SHADOW_*

A.   PARMVNT_UPG
D.   TABIM_SHADOW_*

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

A. After SUM has ended

B. During the Execution roadmap step

C. Before the start of the SUM technical downtime

D. During the SUM technical downtime

D.   During the SUM technical downtime